The design plan was completed on June 12,2009.
The solar power system is mainly to provide power supply for lighting load.
(1) The complementary centralized power plant .
Load conditions: 80sets of 50W lamps, light source is Electrodeless Lamp.
Solar System requirements: according to 4 hours’ lighting per day & 7 consecutive rainy days.
Solar System Configuration:
Solar Modules: 135W 70 pcs
Solar Controller: 110V/100A 1 set
Storage Battery: 2V/2000AH 55 units
(2) The complementary solar lights.
Load: 80W * 2-sided solar street light 34 unites (parking lot), 60W solar street lamp 115 pcs; light source is LED.
Solar System requirements: according to 4 hours’ lighting per day & 7 consecutive rainy days.
Solar System Configuration:
(Double-sided light ) Solar module: 175W 2pcs
Solar Controller: 24V/10A 1 set
Storage Battery: 12V/150AH 4 units
(Single-sided lamp ) Solar module: 135W 1 pcs
Solar Controller: 24V/10A 1 set
Storage Battery: 12V/120AH 2 units |